• Twitter
  • Facebook
  • Youtube
  • Instagram
  • Google+

Kamis, 30 April 2015

Aerial View of Sumberjaya Interchange

Hey guys, since this day I have a very high traffic on my blog after my thread posted on Kaskus, now I'm really excited to share you some new pictures from Cikampek-Palimanan Toll Road project. Now is the pictures of Sumberjaya Interchange which is located at Section 6A (if you referring to the project's sections) or Cirebon (if you are referring to the region). The construction itself is carried out by PT. Hutama Karya (Persero). As it is located in a very stable area, the construction is using rigid pavement.

Wanna see the aerial view of Sumberjaya Interchange? Here we go.




The above picture shows us the aerial view of Sumberjaya Interchange from the exit. If you are going to Cirebon you take the lane to the right but first take the round turn. Meanwhile if you are going to Jakarta, take the left side lane directly from the toll gate (which is not shown in this picture).

Another angle is here:

From this angle you can see the lane trough the exit toll is on the upper right. If you are aware you can see the concrete slipform paver on the lower lane with its blue top cover. Looks like it is Slipform Paver Wirtgen SP 500 over there. :-D.

0 komentar:

Posting Komentar

Contact

Get in touch with me


Adress/Street

Perum Sakina Residence Kav. E, Cigadung, Subang
Jawa Barat 41213

Phone number

+(62) 81 2121 59 366

Email

furqonabdi@gmail.com